{"id":1468,"date":"2017-01-23T16:02:51","date_gmt":"2017-01-23T16:02:51","guid":{"rendered":"http:\/\/www.headmade.ro\/?page_id=1468"},"modified":"2018-07-10T12:03:24","modified_gmt":"2018-07-10T10:03:24","slug":"full-list-of-projects","status":"publish","type":"page","link":"https:\/\/www.headmade.ro\/index.php\/en\/projects-list\/full-list-of-projects\/","title":{"rendered":"Full list of projects"},"content":{"rendered":"<h1>Full list of projects<\/h1>\n<p><div data-post-id='29' class='insert-page insert-page-29 '><h2>Residential Projects<\/h2>\n<h3>APARTMENTS<\/h3>\n<p>BAICULUI HIGH RISE APPARTMENTS \u2013 Baicului Street, Bucharest, 2010. 2B+GF+15. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>RESIDENCE &#038; COMMERCIAL SPACES \u2013 Liviu Rebreanu Street, Bucharest, 2009. 3B+GF +Mezanine+ 11. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>RESIDENTIAL UNITS WITH COMMERCIAL SPACE \u2013 Ghe. Marinescu Street, Bucharest, 2009. GF+2+Mansard.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/bega-residential-complex\/\">BEGA RESIDENTIAL COMPLEX<\/a> &#8211; Iuliu Grozesc Street, Timisoara. 2009.  2B+GF+4\/6\/8.  Urban study PUZ, concept design, full documentation for authorisation to construct.<\/p>\n<p>RESIDENTIAL UNITS WITH ART GALLERY \u2013 D-na Chiajna Street, Bucharest, 2008. B+GF+3\/4. Urban study PUD, full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. <\/p>\n<p>DAMBOVITA RESIDENTIAL\u2013 Aleea lacul Morii, Bucharest, 2015. 2B+GF+9\/11. Detailed layout design, concept design, 3d and urban insert, basis for bussines and investment potential study.<\/p>\n<p>MAYORY APPARTMENTS \u2013 Teodosie Rudeanu Street, Bucharest, 2013. 2B+GF+4\/5+7\/8. Detailed layout design in different options and configurations, concept design, 3d and urban insert, feasability study.<\/p>\n<p>SMALL APPARTMENT BLOCK \u2013 Feroviarilor Street, Bucharest, 2013. SB+UpGF+3. Concept design, detailed layout design,  basis for bussines and investment potential study.<\/p>\n<p>HIGH RISE PATIO RESIDENTIAL \u2013 Valsanesti Street, Bucharest, 2010. 2B+GF+9. Urban study PUD, concept design, detailed layout design, 3d, feasability study.<\/p>\n<p>DOLDORA RESIDENTAIL &#038; COMMERCIAL SPACE \u2013 Pucheni Street, Bucharest, 2012. GF+4\/8. Urban study PUD, detailed layout design in different options and configurations, concept design, 3d and urban insert, feasability study.<\/p>\n<p>AFFORDABLE APPARTMENTS \u2013 Valea Doftanei Street, Bucharest, 2011.2013. B+GF+6. Urban study PUD, concept design, detailed layout design in different options and configurations, 3d and urban insert, feasability study.<\/p>\n<h3>HOUSES<\/h3>\n<p>NARROW TOWN HOUSE \u2013 Balotului Street, Bucharest. 2015. P+2+Roof terrace. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>MODERN HOUSE WITH POOL \u2013 Afumati, 2016, P+1. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SENNIOR ASSIST \u2013 ELDERLY ASISTED LIVING WITH MEDICAL UNIT \u2013 MOARA VLASIEI, 2012. B+GF+2+ Terrace.  Feasibility study and architectural documentation for full documentation for authorisation to construct including fire expertise.<\/p>\n<p>SEMIDETACHED HOUSE WITH FLAT ROOF \u2013 Casin Street, Bucharest, 2015. GF+2+Terrace. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SEMIDETACHED HOUSE with 3 apartments \u2013 Domnesti, 2015. GF+1. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>FAMILY HOUSE ON ADJOINING PROPERTY WALL \u2013 Balotului Street, Bucharest, 2015. GF+1+Terrace.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SUMMER HOUSE\/ SWIMMINGPOOL HOUSE &#038; SWIMMINGPOOL\u2013 Balotesti, 2013. GF. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>12 x VERNACULAR ARCHITECTURE HOUSES. RENOVATION AND EXTENSION \u2013 jud. Alba, 2012. B+ GF,  B+GF+Mansard. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>WOOD STRUCTURE HOUSE \u2013 jud. Ilfov, 2011. GF. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>STEPPED HOUSE WITH SWIMMINGPOOL \u2013 Balotesti, GF+M. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>SERIES OF 3 WOOD STRUCTURE HOUSES &#8211; Balotesti, 2007.  GF+M. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>10 HOLLIDAY HOUSES ON A SLOPPED TERAIN &#8211; Azuga, 2006. B+GF+M. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution,  authorisation to construct issued. Completed.<\/p>\n<p>HOLLIDAY RANCH HOUSE \u2013 Azuga, 2006. GF+1+M. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>EXTENSION FOR AN OLD HOUSE \u2013 Abrud Street, Bucharest, 2007. GF+1. Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Completed.<\/p>\n<p>HOUSE WITH FOREST VIEW TERRACE \u2013 Sos. Bucharest &#8211; Ploiesti, Bucharest, 2007. GF+2. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>HOUSE WITH MANSARD TERRACE VIEW \u2013 Av. Gheorghe Stalpeanu, Bucharest, 2004. B+GF+1+Mansard. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Location in protected area. Completed.<\/p>\n<p>HOUSE FOR A SMALL FAMILY \u2013 Mogosoaia, 2006.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>BECK&#8217;S PATIO HOUSE &#8211; Marin Calciu Street, Bucharest 2005. Full documentation for authorisation to construct, authorisation to construct issued.<\/p>\n<p>ZAVATE HOUSE \u2013 Ilfov, Bucharest 2003. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>BUZESCU OFFICE\/RESIDENCE \u2013  Porumbaru Street, Bucharest, 2002. GF+P+1. Extension of existing old house.  Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area. Completed. <\/p>\n<p>KEUPKIN RESIDENCE \u2013  Andrei Muresanu Street. 2002. Extend the 2nd floor into the roof area.  Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area.<\/p>\n<\/div><br \/>\n<div data-post-id='21' class='insert-page insert-page-21 '><h2>Healthcare Projects<\/h2>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/e3-brodina-clinic-regina-maria\/\">REGINA MARIA &#8211; E3 Brodina Clinic<\/a> \u2013 Brodina Street, 2017. Pediatrics, re-partitioning and refurbishment of the 3rd floor of an existing building. Full documentation for authorization to construct, full technical documentation for execution. Furniture design. Completed.<\/p>\n<p>REGINA MARIA \u2013 PIPERA CLINIC EXTENSION AND RENOVATION \u2013 Dimitrie Pompeiu Street, Bucharest, 2016. Full documentation for authorization to construct,  full technical documentation for execution. Completed.<\/p>\n<p>MEDICAL CLINIC WITH DAY SURGERY, IVF CENTER, KINETOTHERAPY GYM \u2013 Alexandrina Street, Bucharest, 2015. GF+ 1st floor. Full documentation for authorization to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>REGINA MARIA \u2013 VIP CLINIC \u2013 Ion Ionescu de la Brad Street, Bucharest, 2015. Refurbishment and new partitions. Full documentation for authorization to construct,  full technical documentation for execution. Completed.<\/p>\n<p>REGINA MARIA \u2013 SMALL CLINIC AND BACK OFFICES \u2013  Ion Ionescu de la Brad Street, Bucharest, 2015. Refurbishment and new partitions. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/provita-diagnostic-and-treatment-centre\/\">DIAGNOSTIC AND TREATMENT CENTRE, PROVITA<\/a> \u2013 Agricultori Street, Bucharest 2014. B+GF+4. New Built. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>WELLBORN \u2013 FIV CLINIC \u2013 Brodina Street, 2013. Change of medical speciality, refurbishment and new partitions. B+GF+3. Full documentation for authorization to construct, full technical documentation for execution. Completed.<\/p>\n<p>REGINA MARIA \u2013 DOROBANTI CLINIC WITH PEDIATRIC DEPARTMENT- Bdul Dorobanri, Bucharest, 2010.<\/p>\n<p>REGINA MARIA \u2013 PEDIATRIC AND GENERAL MEDICINE LUJERULUI CLINIC\u2013 Bdul Iuliu Maniu, Bucharest, 2009.  Full documentation for authorization to construct,  full technical documentation for execution. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/regina-maria-maternity-hospital\/\">REGINA MARIA \u2013 MATERNITY HOSPITAL<\/a> \u2013 Brodina Street, Bucharest, 2008. Rehabilitation of existing concrete structure with no walls. Full documentation for authorisation to construct,  full technical documentation for execution. Completed.<\/p>\n<p>CMU \u2013 SEMA PARK CLINIC \u2013 Splaiul Independentei, Bucharest, 2008. Full documentation for authorisation to construct,  full technical documentation for execution. Completed.<\/p>\n<p>CMU KIDS OPERA CENTER,  PEDIATRIC CLINIC &#8211; Costache Negri Street, Bucharest, 2006. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>SENNIOR ASSIST \u2013 ELDERLY ASSITED LIVING WITH MEDICAL UNIT \u2013 Moara Vlasiei, 2012. B+GF+2+ Terrace. Concept design, detailed layout design, 3d studies, feasibility study, full detailed project for authorisation to construct.  <\/p>\n<p>REGINA MARIA \u2013 SMALL DAY CARE SURGERY UNIT \u2013 Clucerului Street, Bucharest, 2011. Full documentation for execution and fire approval for functioning.<\/p>\n<\/div><br \/>\n<div data-post-id='31' class='insert-page insert-page-31 '><h2>Urban Planning Projects<\/h2>\n<p>PUD LIVIU REBREANU \u2013 Bucharest, 2008. Site area = 1500sqm, 3B+GF+Mez+11. Residential, comercial, public space.<\/p>\n<p>PUD BAICULUI \u2013 Bucharest, (2007), 2012. Site area = 18.000 sqm, 3B+GF+15-17, 3B+GF+13.  Residential, commercial, offices, public space.<\/p>\n<p>PUD ENERGITICIENILOR \u2013 Bucharest, 2010. Site area = 44.000 sqm. Residential, commercial, offices.<\/p>\n<p>PUZ BUCOV \u2013 Prahova, 2009. Site area = 47.000 sqm. Layout plan for residential units, comerce, bike line, public spaces.<\/p>\n<p>PUZ SUCEAVA \u2013 Suceava, 2009. Site area = 250.000 sqm. Study for rehabilitation of an industrial area, near the river.<\/p>\n<p>PUZ LACUL MORII \u2013 Bucharest, 2009. Site area = 300.000 sqm. Study for a mixed used neighbourhood including residential, offices, commercial, public spaces and promenade area along the lake.<\/p>\n<p>PUZ CLAMIR \u2013 Timisoara, 2008. Site area =  13.800 sqm.  Mixed used development on a former industrial site: residential, offices, commercial, public spaces and promenade area along the Bega river. <\/p>\n<p>BEGA PEDESTRAIN AREA \u2013 Timisoara, 2008. Study for The Maiory of Timisoara based on which it is compulsory for all future buildings to present a pedestrian\/ promenade area along Bega River, as stated in the PUZ CLAMIR.<\/p>\n<p>PUD VALEA DOFTANEI \u2013 Bucharest, 2008. Site area = 6800 sqm. Residential project, 2B+GF+5E.<\/p>\n<p>PUD SPLAIUL INDEPENDENTEI \u2013 Bucharest, 2008. Site area = 18000 sqm. Students residences, residential, public spaces.<\/p>\n<p>PUZ PORUMBARU STREET \u2013 Bucharest, 2008. Site area =412 sqm. Heigh standard residences, 2B+GF+3\/4. Location in protected area. <\/p>\n<p>PUD DNA. CHIAJNA \u2013 Bucharest, 2007. Site area = 215 sqm. Residential units with art gallery, B+GF+3\/4.<\/p>\n<p>PUZ METROPOLIS CENTER \u2013 Bucharest, 2007. Site area = 7000 sqm . Mixed use commercial, offices, hotel, 2B+GF+7. Location in protected area. Existing momument building and industrial monument facade integrated. Designed for plusarchitectura. Location in protected area.<\/p>\n<p>PUZ REPUBLICII \u2013 Azuga, 2006. Site area = 9300 sqm. Urban layout for accese road, individual plots for 10 holliday houses on sloped land and for a ranch house.<\/p>\n<p>PUZ APARTHOTEL \u2013 Aleea Modrogan, Bucharest, 2002. Aparthotel B+GF+5\/6. Designed for B2 International. Location in protected area. <\/p>\n<p>PUZ CTIN MILLE \u2013 Ctin Mille Street, Bucharest, 2002. Office building, 2B+GF+5\/7. Designed for B2 International. Location in protected area.<\/p>\n<\/div><br \/>\n<div data-post-id='27' class='insert-page insert-page-27 '><p><H2>Projects in Protected Areas<\/H2><br \/>\n<a href=\"http:\/\/www.headmade.ro\/index.php\/en\/boutique-hotel-stirbey-manor\/\">BOUTIQUE HOTEL, STIRBEY MANOR<\/a> \u2013 Darmanesti. B+GF+2+Mansard. Restoration, renovation and conversion into boutique hotel. Conversion of the attic floor into hotel space. Full documentation for authorisation to construct for architecture, full technical documentation for execution for architecture. Coordination of structure and installation design. Specialist studies. Location in protected area. Protected buildings. Works on going.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/metropolis-center\/\">METROPOLIS CENTER<\/a> \u2013 Iancu de Hunedoara Street, Bucharest. 2010. 2B+GF+7. B+GF+2+Mansard. Mixed use commercial, offices, hotel. PUZ study. Existing monument building and industrial monument fa\u00e7ade integrated. Full documentation for authorisation to construct, full technical documentation for execution. Designed for plusarchitectura. Location in protected area. Protected buildings. Completed.<\/p>\n<p>HOUSE WITH MANSARD TERRACE VIEW\u2013 Av. Gheorghe Stalpeanu, Bucharest. 2004. B+GF+1+Mansard. Full documentation for authorisation to construct, full technical documentation for execution,  authorisation to construct issued. Location in protected area. Completed.<\/p>\n<p>BUZESCU OFFICE\/RESIDENCE \u2013 Porumbaru Street, Bucharest 2002. GF+P+1. Extension of existing old house. Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area. Completed.<\/p>\n<p>KEUPKIN RESIDENCE \u2013 Andrei Muresanu Street. 2002. Extend the 2nd floor into the roof area.  Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area.<\/p>\n<p>DARMANESTI 3 STARS HOTEL \u2013 Darmanesti, 2015. Concept design,  3d presentation, detailed layout design , feasibility study. Location in protected area.<\/p>\n<p>STIRBEY CONFERENCE CENTER \u2013 Darmanesti, 2015. Concept design,  3d presentation, detailed layout design , feasibility study. Location in protected area.<\/p>\n<p>LA STRADA SHOP \u2013 Batistei Street, Bucharest, 2007. Remodelling, concept design, 3d presentation, interior design, mood boards, furniture design. Full documentation for authorisation to construct, full technical documentation for execution. Location in protected area. Completed.<\/p>\n<p>CENTRAL BOUTIQUE HOTEL \u2013 Nicolae Iorga Street, Bucharest, 2006. Restoration, renovation and conversion into boutique hotel for two adjoining buildings. Conversion of the attic floor into hotel space. Remodelling, concept design, 3d presentation, interior design, terrace design, detailed layout plans, feasibility study. Location in protected area.<\/p>\n<p>PUZ PORUMBARU STREET \u2013 Bucharest.2008. Aland =412 sqm. Heigh standard residences, 2B+GF+3\/4.  Location in protected area. <\/p>\n<p>PUZ APARTHOTEL \u2013 Aleea Modrogan, Bucharest. 2002. Apart hotel B+GF+5\/6. Designed for B2 International. Location in protected area.<\/p>\n<p>PUZ CTIN MILLE \u2013 Ctin Mille Street, Bucharest. 2002. Office building. 2B+GF+5\/7. Designed for B2 International. Location in protected area.<\/p>\n<\/div><br \/>\n<div data-post-id='17' class='insert-page insert-page-17 '><p><H2>Offices, Commercial and Hospitality<\/H2><br \/>\n<a href=\"http:\/\/www.headmade.ro\/index.php\/en\/pipera-bussines-tower\/\">OFFICE BUILDING \u201cPIPERA BUSSINES TOWER\u201d<\/a> \u2013 Dimitrie Pompeiu Street, Bucharest. 2007. 2B+GF+13+Th. Office space with top view conference area. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>CERTASIG \u2013 Nicolae Caranfil Street, Bucharest. 2009. B+GF+5. Extension with roof conference area, interior design and partitioning for office space. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>LABORMED PHARMA \u2013 Theodor Pallady Street, Bucharest. 2009. GF+2. Office and laboratory addition to the existing warehouse. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/metropolis-center\/\">METROPOLIS CENTER<\/a> \u2013 Iancu de Hunedoara Street, Bucharest. 2010. 2B+GF+7. B+GF+2+Mansard. Mixed use commercial, offices, hotel. PUZ study. Existing monument building and industrial monument fa\u00e7ade integrated. Full documentation for authorisation to construct, full technical documentation for execution. Designed for plusarchitectura. Location in protected area. Protected buildings. Completed.<\/p>\n<p>DOLDORA COMMERCIAL SPACE \u2013 Pucheni Street, Bucharest. 2010. GF+1. Shopping area, back offices, parking. PUZ study. Full documentation for authorisation to demolish. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/boutique-hotel-stirbey-manor\/\">BOUTIQUE HOTEL, STIRBEY MANOR<\/a> \u2013 Darmanesti. B+GF+2+Mansard. Restoration, renovation and conversion into boutique hotel. Conversion of the attic floor into hotel space. Full documentation for authorisation to construct for architecture, full technical documentation for execution for architecture. Coordination of structure and installation design. Specialist studies. Location in protected area. Protected buildings. Works on going. <\/p>\n<p>ANGELO HOTEL \u2013 Otopeni Airport, Ilfov.  Renovation, rehabilitation and interior design for upgrade to 4 stars and increase sound comfort. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>HILTON CONFERENCE CENTER \u2013 Episcopiei Street, Bucharest, 2014. Remodelling, concept design, 3d presentation, interior design, mood boards. <\/p>\n<p>COMMERCIAL SPACE &#038; VEGETABLE\/FRUITS MARKET \u2013 Drumul Taberei, Bucharest, 2013. Concept design, urban study,  3d presentation, detailed layout design, feasibility study.<\/p>\n<p>DARMANESTI 3 STARS HOTEL \u2013 Darmanesti, 2015. Concept design,  3d presentation, detailed layout design , feasibility study. Location in protected area.<\/p>\n<\/div><br \/>\n<div data-post-id='25' class='insert-page insert-page-25 '><p><H2>Interior Design Projects<\/H2><br \/>\nMEDICAL CLINIC WITH DAY SURGERY, IVF CENTER, KINETOTHERAPY GYM \u2013 Alexandrina Street, Bucharest, 2015. GF+ 1st floor. Full documentation for authorisation to construct,  full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>NAUMOVICI HOUSE \u2013 Pipera, Bucharest, 2014, Gf+1+Mansard. Full technical documentation for interior design, 3d interior design. Furniture design. Facade redesign. Completed.<\/p>\n<p>LAKE HOUSE \u2013 Moara Vlasiei, 2014, GF+Mansard. Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>DOGARILOR DUPLEX APPARTMENT \u2013 Dogarilor Street, Bucharest, 2013, 2nd+3rd floor. Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>MUSIC APPARTMENT \u2013 Serdarului Street, Bucharest, 2012. GF. Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>EXIMBANK  &#8211; OFFICE DESIGN- METROPOLIS CENTER &#8211; Iancu de Hunedoara Street, Bucharest, 2010. 4th floor. Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>PIRITEX SHOWROOM \u2013 Calea Vitan, Bucharest, 2010. 7th floor. Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>CERTASIG \u2013 Nicolae Caranfil Street, Bucharest, 2009. B+GF+5. Extension with roof conference area, interior design and partitioning for office space. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed. <\/p>\n<p>ANGELO HOTEL \u2013 Otopeni Airport, Ilfov, 2008. B+GF+4.Renovation, rehabilitation and interior design for upgrade to 4 stars and increase sound comfort. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d concept design. Furniture design. Completed.<\/p>\n<p>POPA SAVU FAMILY APPARTAMENT \u2013 Popa Savu Street, Bucharest, 2008. 2nd floor.Full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>CMU \u2013 SEMA PARK CLINIC \u2013 Splaiul independentei, Bucharest, 2008. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>LA STRADA SHOP \u2013 J.L.Calderon Street, Bucharest, 2007. GF. Full documentation for authorisation to construct, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>IMMOBILIAR GROUP OFFICES \u2013 Bdul Dimitrie Cantemir, Bucharest, 2006. GF+ 1st floor. Full documentation for authorisation to construct, full technical documentation for interior design, 33d interior design. Furniture design. Completed.<\/p>\n<p>CMU \u2013 OPERA CENTER CMU KIDS \u2013 PEDIATRIC CLINIC \u2013 Costache Negri Street, Bucharest, 2006. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Furniture design. Completed.<\/p>\n<p>STIRBEY CASTEL \u2013 Darmanesti, Bacau, 2015. B+GF+2+Mansard. Restoration, renovation and conversion into boutique hotel. Conversion of the attic floor into hotel space. 3d interior design. Interior concept design for standard rooms.<\/p>\n<p>HILTON CONFERENCE CENTER \u2013 Episcopiei Street, Bucharest, 2014. Mezzanine floor. Remodelling, concept design, 3d presentation, 3d interior design, interior design concept, mood boards. <\/p>\n<p>12 x VERNACULAR ARCHITECTURE HOUSES. RENOVATION AND EXTENSION \u2013 jud. Alba, 2012. B+ GF,  B+GF+Mansard. Full documentation for authorisation to construct, full technical documentation for execution, interior design concept design, 3d interior design,  authorisation to construct issued.<\/p>\n<p>TANDARICA FACADE AND ENTRANCE HALL REMODELLING \u2013 Lahovari, Bucharest, 2012. Full documentation for authorisation to construct, full technical documentation for execution, full technical documentation for interior design, 3d interior design. Authorisation obtained.<\/p>\n<\/div><br \/>\n<div data-post-id='23' class='insert-page insert-page-23 '><h2>Industrial Projects<\/h2>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/winery-for-processing-and-bottling-grape-wine\/\">WINERY FOR PROCESSING AND BOTTLING GRAPE WINE<\/a> \u2013 Adamclisi, Constanta. 2012\/2106. GF+ Mezzanine Green roof building. Full documentation for authorisation to construct, full technical documentation for execution. Authorisation to construct due. <\/p>\n<p>GRAIN STORAGE AND DISTRIBUTION WAREHOUSE \u2013 Alexandria. 2013. GF.  PUZ Study. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>GRAIN STORAGE AND DISTRIBUTION WAREHOUSE \u2013 Bailesti. 2013. GF.  PUZ Study. Full documentation for authorisation to construct, full technical documentation for execution. Completed.<\/p>\n<p>JOHNSON CONTROL \u2013 Ploiesti. 2008.  Full documentation for authorisation to construct, full technical documentation for execution. Designed for B2 International. Completed.<\/p>\n<\/div><br \/>\n<div data-post-id='19' class='insert-page insert-page-19 '><h2>Competitions<\/h2>\n<p>Competition for the modernization and rehabilitation of the central area of C\u00e2mpina, Romania, 2010 \u2013 3rd Prize<\/p>\n<p>The contest for redesigning the Livada Postei Park in Bra\u0219ov, Romania, 2011<\/p>\n<\/div><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Full list of projects<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":15,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/1468"}],"collection":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/comments?post=1468"}],"version-history":[{"count":3,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/1468\/revisions"}],"predecessor-version":[{"id":2090,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/1468\/revisions\/2090"}],"up":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/15"}],"wp:attachment":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/media?parent=1468"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}