{"id":29,"date":"2016-07-20T12:55:09","date_gmt":"2016-07-20T12:55:09","guid":{"rendered":"http:\/\/www.headmade.ro\/?page_id=29"},"modified":"2018-07-10T12:30:28","modified_gmt":"2018-07-10T10:30:28","slug":"residential-projects","status":"publish","type":"page","link":"https:\/\/www.headmade.ro\/index.php\/en\/projects-list\/residential-projects\/","title":{"rendered":"Residential Projects"},"content":{"rendered":"<h2>Residential Projects<\/h2>\n<h3>APARTMENTS<\/h3>\n<p>BAICULUI HIGH RISE APPARTMENTS \u2013 Baicului Street, Bucharest, 2010. 2B+GF+15. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>RESIDENCE &#038; COMMERCIAL SPACES \u2013 Liviu Rebreanu Street, Bucharest, 2009. 3B+GF +Mezanine+ 11. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>RESIDENTIAL UNITS WITH COMMERCIAL SPACE \u2013 Ghe. Marinescu Street, Bucharest, 2009. GF+2+Mansard.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p><a href=\"http:\/\/www.headmade.ro\/index.php\/en\/bega-residential-complex\/\">BEGA RESIDENTIAL COMPLEX<\/a> &#8211; Iuliu Grozesc Street, Timisoara. 2009.  2B+GF+4\/6\/8.  Urban study PUZ, concept design, full documentation for authorisation to construct.<\/p>\n<p>RESIDENTIAL UNITS WITH ART GALLERY \u2013 D-na Chiajna Street, Bucharest, 2008. B+GF+3\/4. Urban study PUD, full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. <\/p>\n<p>DAMBOVITA RESIDENTIAL\u2013 Aleea lacul Morii, Bucharest, 2015. 2B+GF+9\/11. Detailed layout design, concept design, 3d and urban insert, basis for bussines and investment potential study.<\/p>\n<p>MAYORY APPARTMENTS \u2013 Teodosie Rudeanu Street, Bucharest, 2013. 2B+GF+4\/5+7\/8. Detailed layout design in different options and configurations, concept design, 3d and urban insert, feasability study.<\/p>\n<p>SMALL APPARTMENT BLOCK \u2013 Feroviarilor Street, Bucharest, 2013. SB+UpGF+3. Concept design, detailed layout design,  basis for bussines and investment potential study.<\/p>\n<p>HIGH RISE PATIO RESIDENTIAL \u2013 Valsanesti Street, Bucharest, 2010. 2B+GF+9. Urban study PUD, concept design, detailed layout design, 3d, feasability study.<\/p>\n<p>DOLDORA RESIDENTAIL &#038; COMMERCIAL SPACE \u2013 Pucheni Street, Bucharest, 2012. GF+4\/8. Urban study PUD, detailed layout design in different options and configurations, concept design, 3d and urban insert, feasability study.<\/p>\n<p>AFFORDABLE APPARTMENTS \u2013 Valea Doftanei Street, Bucharest, 2011.2013. B+GF+6. Urban study PUD, concept design, detailed layout design in different options and configurations, 3d and urban insert, feasability study.<\/p>\n<h3>HOUSES<\/h3>\n<p>NARROW TOWN HOUSE \u2013 Balotului Street, Bucharest. 2015. P+2+Roof terrace. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>MODERN HOUSE WITH POOL \u2013 Afumati, 2016, P+1. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SENNIOR ASSIST \u2013 ELDERLY ASISTED LIVING WITH MEDICAL UNIT \u2013 MOARA VLASIEI, 2012. B+GF+2+ Terrace.  Feasibility study and architectural documentation for full documentation for authorisation to construct including fire expertise.<\/p>\n<p>SEMIDETACHED HOUSE WITH FLAT ROOF \u2013 Casin Street, Bucharest, 2015. GF+2+Terrace. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SEMIDETACHED HOUSE with 3 apartments \u2013 Domnesti, 2015. GF+1. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>FAMILY HOUSE ON ADJOINING PROPERTY WALL \u2013 Balotului Street, Bucharest, 2015. GF+1+Terrace.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Works due to start March 2016.<\/p>\n<p>SUMMER HOUSE\/ SWIMMINGPOOL HOUSE &#038; SWIMMINGPOOL\u2013 Balotesti, 2013. GF. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>12 x VERNACULAR ARCHITECTURE HOUSES. RENOVATION AND EXTENSION \u2013 jud. Alba, 2012. B+ GF,  B+GF+Mansard. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>WOOD STRUCTURE HOUSE \u2013 jud. Ilfov, 2011. GF. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued.<\/p>\n<p>STEPPED HOUSE WITH SWIMMINGPOOL \u2013 Balotesti, GF+M. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>SERIES OF 3 WOOD STRUCTURE HOUSES &#8211; Balotesti, 2007.  GF+M. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>10 HOLLIDAY HOUSES ON A SLOPPED TERAIN &#8211; Azuga, 2006. B+GF+M. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution,  authorisation to construct issued. Completed.<\/p>\n<p>HOLLIDAY RANCH HOUSE \u2013 Azuga, 2006. GF+1+M. Urban study PUD, full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>EXTENSION FOR AN OLD HOUSE \u2013 Abrud Street, Bucharest, 2007. GF+1. Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Completed.<\/p>\n<p>HOUSE WITH FOREST VIEW TERRACE \u2013 Sos. Bucharest &#8211; Ploiesti, Bucharest, 2007. GF+2. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>HOUSE WITH MANSARD TERRACE VIEW \u2013 Av. Gheorghe Stalpeanu, Bucharest, 2004. B+GF+1+Mansard. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Location in protected area. Completed.<\/p>\n<p>HOUSE FOR A SMALL FAMILY \u2013 Mogosoaia, 2006.  Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>BECK&#8217;S PATIO HOUSE &#8211; Marin Calciu Street, Bucharest 2005. Full documentation for authorisation to construct, authorisation to construct issued.<\/p>\n<p>ZAVATE HOUSE \u2013 Ilfov, Bucharest 2003. Full documentation for authorisation to construct, full technical documentation for execution, authorisation to construct issued. Completed.<\/p>\n<p>BUZESCU OFFICE\/RESIDENCE \u2013  Porumbaru Street, Bucharest, 2002. GF+P+1. Extension of existing old house.  Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area. Completed. <\/p>\n<p>KEUPKIN RESIDENCE \u2013  Andrei Muresanu Street. 2002. Extend the 2nd floor into the roof area.  Full documentation for demolition, full documentation for authorisation to construct, full technical documentation for execution, authorisation to demolish issued, authorisation to construct issued. Designed for B2 International. Location in protected area.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Residential Projects APARTMENTS BAICULUI HIGH RISE APPARTMENTS \u2013 Baicului Street, &hellip;<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":15,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":[],"_links":{"self":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/29"}],"collection":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/comments?post=29"}],"version-history":[{"count":4,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/29\/revisions"}],"predecessor-version":[{"id":2100,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/29\/revisions\/2100"}],"up":[{"embeddable":true,"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/pages\/15"}],"wp:attachment":[{"href":"https:\/\/www.headmade.ro\/index.php\/wp-json\/wp\/v2\/media?parent=29"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}